What we did





Copper roof covering
New rolled copper roof to match closely adjoining shelters layed on a felt membrane and timber deck.
New roof structure
Two complete new galvanised steel roof structures were fabricated off site and carefully craned into position. On completion we installed the tongue and groove soffit boarding and fascia.
Cast iron components
Existing salvaged cast iron parts were brought out of storage. Missing sections were measured and cast at a local foundry. All were trial fitted off site.
Redecorations
Washdown, preparation and full redecoration of both the new and existing shelter surfaces with a specialist marine grade paint system.

Commercial Services
JG&JR Langridge have extensive main contractor experience of working on a variety of commercial property for our local authority, leisure services, residential and education clients.

Featured Work
Holy Trinity Science Lab Refurbishment
JG & JR Langridge successfully tendered for this refurbishment of four school classroom science labs.